Add up the loss of a link from the fibre, connectors, splices and any splitter, then check it against the transmitter and receiver to see the margin you have left.

Link, backbone or PON
A handheld optical power meter and light source joined by a yellow test cord on a bench beside a fibre patch panel
EVT 09dBFibre, joints and splits
Fibre loss budget calculatorFibre, connectors, splices and splitters against your optics
Runs
In your browser
Sends
Nothing

01The link

02Joints and splits

03The optics optional

Fibre
-
Connectors
-
Splices
-
Splitter and other
-
Total link loss
-
Light at the receiver
-
Against the budget
-

A loss budget adds up every place the light is weakened between the transmitter and the receiver: the glass itself, each connector pair, each splice and any splitter. Compare the total with what the optics can lose and you know before the cable goes in whether the link will work, and with how much to spare.

How the loss is worked out

Total loss = length in km x fibre loss in dB per km + connector pairs x loss per pair + splices x loss per splice + splitter loss + any other loss. The calculator then adds the safety margin and compares the result with the budget, which is the transmitter's minimum launch power less the receiver's sensitivity, both in dBm from the datasheets.

  • Fibre: single-mode cable is usually designed at about 0.35 dB per km at 1310 nm and 0.25 dB per km at 1550 nm. The TIA cabling standard allows up to 0.5 dB per km for outdoor and 1.0 dB per km for indoor single-mode cable, and 3.0 dB per km for 50 µm multimode at 850 nm.
  • Connectors: the TIA limit is 0.75 dB per mated pair. Clean factory cords usually measure 0.3 dB or less; 0.5 dB is a sensible design figure.
  • Splices: the TIA limit is 0.3 dB per splice; a good fusion splice is usually under 0.1 dB. Mechanical splices lose more.
  • Splitters: a 1:32 PLC splitter loses about 17 dB, which is why it dominates every FTTH budget. See fibre optic splitters.

What a good margin is

Leave at least 3 dB spare. Repairs add splices, cords get dirty, connectors wear and a cable that is bent or crushed later loses more. On a GPON network the class B+ optics cover 13 to 28 dB and class C+ up to 32 dB, so a 1:32 split leaves roughly 7 to 10 dB for the fibre, joints and margin. Too little loss can also be a problem on short single-mode links with long reach optics: if the received power is above the receiver's overload level, fit an attenuator.

Check it with a test

A calculated budget is what the link should lose. After installation, a light source and power meter measure what it does lose, and an OTDR shows where. Ask for a test report per fibre at both wavelengths, with the measured loss beside the budget. See fibre testing and certification and OTDRs and test equipment, or convert power meter readings with the dBm to mW converter.

A guide, not a design

These figures follow the published standards and common design values, and the calculators work in your browser. They are a guide for planning and checking quotes. The datasheets for your cable and optics, and the network designer or contractor, have the final word. Nothing you type here is sent anywhere.

Frequently asked questions

What is a fibre loss budget?
The most light a link can lose and still work, compared with what the planned link will lose. The budget comes from the optics (minimum transmit power less receiver sensitivity); the link loss comes from the fibre length, connectors, splices and splitters. If the link loss plus a margin of about 3 dB is less than the budget, the link should work.
How much loss is acceptable on a fibre link?
It depends on the optics and the standard, not on one number. A 2 km single-mode link with two connector pairs and two splices loses about 1.9 dB, well inside most optics. Short reach 10G multimode allows about 2.6 dB in total, so connector losses matter there. Use the datasheet figures for your optics in the calculator.
Should I use typical or maximum figures?
Typical figures give the likely result; the TIA maximums give the worst case a compliant installation may reach. For a design, use the design figures with a 3 dB margin, and check that the link still passes with the maximums if the optics are near their limit.
Why does my measured loss differ from the calculation?
Dirty or worn connectors, a tight bend, a poor splice or a different fibre from the one assumed. A loss well above the calculation usually points to one bad event, which an OTDR trace will show. Clean and inspect the connectors first: it is the most common cause.

More fibre calculators

Free quote request, no obligation

Request quotes for fibre testing

Fill it in the way a fibre contractor would size up the job: the route and the cores, the fibres to splice, the homes to connect, the trench to dig, or simply how many. The planner works out the cable, drums, splices, splitters or duct and draws it as you type. Suppliers and contractors in your area quote you directly.

Fibre job sheetFibre Testing and Certification
Job
79993
Date
2026-11-22
Cost to you
Free

01The job

02The fibres (optional, it helps the quote)

Splice trayA guide

-
-
-
-
-
-
Estimate
-

A guide from your figures, not a quote.

03On site now

04Your list (optional)

  1. 01
  2. 02
Up to 12 lines: cable, cords, connectors, panels, closures, splices or work.
Needs and options

05Your details

Free and no obligation. By sending you agree that we may share your request with suitable fibre optic cable suppliers, installers and contractors. See our privacy policy.